The V-Concept of Testing - Points to Ponder on Agile

1.Cost/Schedule Impact – Agile does NOT have a cost/schedule advantage over a typical waterfall model, assuming that the requirements remain stable over the duration of the project. Where Agile makes a difference is Iterative development addresses the impact of changing requirements far better than waterfall. Reduces the risk of severe defects during customer review by having multiple iterations and getting continuous feedback from the customer. Continuous integration and validation mean that defect fixes and minor requirement changes during development can be accommodated within the iteration. 2. Iterative Development – Split the dev phase into multiple iterations, depending on the total effort and risk of application Given our resource situation, iterations should ideally not be more than 8-12 weeks The first iteration while focusing on the framework and infrastructure components should include at least some UI intensive scenarios, to facilitate early feedback from the client.3. Development focus Test-driven design and programming – Agile depends heavily on the premise that the developed code is well-tested. The programmers should write code that is easily testable from an object oriented perspective. Automated and Complete Unit Testing – Code coming out of the developer’s workshop should have undergone complete unit testing amounting to 100% of achievable code coverage (who certifies this?). Emphasis is also put on an automated unit test framework, so that multiple iterations can be executed with minimal additional effort. Whenever a new code unit is tested, test previously released units as a sort of regression. Pair Programming – Can be explored based on cost & availability of skilled resources.
4. Continuous Integration Frequent incremental integration as opposed to big bang integration.i. Eliminates high risk integration issues which may lie hidden till the end in a big bang integration scenarioii. Quick turn around time for integration defects – dev or testing is not held up for long periods. Unit Tested Code – Only 100% unit tested code qualifies for continuous integration. Any integration issues should NOT be due to code defects missed during unit testing Frequency – Varies depending on the maturity of team, complexity of requirements, % of UI component in application etc. In our scenario, the recommended target would be at least two integrations a week, after the initial build on the integration box. Validation – Each of the cone integrations shall be smoke tested, and milestones shall be system tested.

window.google_render_ad();

5. Integration Team – A small team of developers will work closely with QA for managing the continuous integration process, and for test support. The responsibilities of the team will be Controlling the contents of each integration Sorting out integration issues Fixing defects found during testing.6. Testing – Agile relies heavily on “nipping defects in the bud”. Agile does not define a single, intensive integration testing phase, for the simple reason that there is no “integration phase”. How do we validate the continuously integrated build then? – Using the system test plan instead, to test minor milestonesi. Milestones – Define milestones that comprise of a small number of related functionalities, which can be tested independently. Ideally the cone integrations and milestones should be planned in such a way that every three or four cone integrations should add up to a milestone.ii. The system test plan for a milestone should be prepared and reviewed at all levels before the milestone is reached.iii. At the end of 2 or 3 milestones, do a full regression of the previous milestones. Defect fixes – Fixes for defects encountered during the system testing should be fixed during the integration for the next milestone, before a lot more functionality gets added on top of the buggy code. This ensures that by the time the application (or the iteration) reaches QA, the number of defects is minimal.
7. QA Involvement – QA Team gets involved from requirements phase itself An experienced QA resource shall be involved during initial requirements gathering and take control of requirement management from the QA side. From the end of the initial requirements phase, the QA plan preparation will go hand in hand with design. The QA plan should be granular in the extreme, containing all of the system or integration test scenarios in detail. QA will be responsible for validation the milestones during continuous integration.8. Team Composition – notes The dev team should aim for at least 50% mix of J2EE resources with quality experience in executing web projects, and usage of tools identified. The QA team should have 50% of its resources well experienced in requirements handling, preparation and management of QA plan from requirements/design, and Agile Testing processes.

Tuesday, June 03, 2008

The V-Concept of Testing

The V Concept of testing detail on the sequence with which the testing should be performed. The life cycle testing is performed against the deliverables at the pre-determined specified points. The SDLC has to be pre-determined for this to happen.
The V concept recommends both the System Development and the System test process to start at the same point referring the same information. The development will have the responsibility of documenting the requirements for the development purpose; which the test team could use for testing purpose as well.In the V-testing concept, your project’s Do and Check procedures slowly converge from start to finish, which indicates that as the Do team attempts to implement a solution, the Check team concurrently develops a process to minimize or eliminate the risk. If the two groups work closely together, the high level of risk at a project’s inception will decrease to an acceptable level by the project’s conclusion.

The various steps involved in V-concept are listed below:

Step 1: Assess Development Plan and StatusThis first step is a prerequisite to building the VV&T Plan used to evaluate the implemented software solution. During this step, testers challenge the completeness and correctness of the development plan. Based on the extensiveness and completeness of the Project Plan the testers can estimate the amount of resources they will need to test the implemented software solution.Step 2: Develop the Test PlanForming the plan for testing will follow the same pattern as any software planning process. The structure of all plans should be the same, but the content will vary based on the degree of risk the testers perceive as associated with the software being developed.Step 3: Test Software RequirementsIncomplete, inaccurate, or inconsistent requirements lead to most software failures. The inability to get requirements right during the requirements gathering phase can also increase the cost of implementation significantly. Testers, through verification, must determine that the requirements are accurate, complete, and they do not conflict with one another.